Ibrox Stadium

Stadium development

Main Stand reconstruction

In the early 1990s, the roof of the Bill Struth Main Stand was removed and an upper tier, the Club Deck, was built above the original 1928 stand. Its red-brick façade stayed in place. These photographs follow the works from cranes and steelwork to the finished stand.

These photographs are shown with the site owner’s permission. Their exact dates are not recorded, so each is marked “Date unknown”.

Date unknown

Cranes over the Main Stand

Tower cranes and steelwork rising above the red-brick Main Stand during the Club Deck works.

Supplied by the site owner · Used with permission.

Date unknown

New roof steelwork from inside

The new roof trusses taking shape above the existing seating, seen from the terraces.

Supplied by the site owner · Used with permission.

Date unknown

Steel frame beside the brickwork

Red scaffolding and yellow crane steel alongside the corner of Leitch’s brick façade.

Supplied by the site owner · Used with permission.

Date unknown

The façade under scaffolding

A crane and scaffolding against the Main Stand exterior, with the roof structure visible above.

Supplied by the site owner · Used with permission.

Date unknown

Roof truss lifted across the stand

Seen from the pitch, a long roof truss sits above the Main Stand between two cranes.

Supplied by the site owner · Used with permission.

Date unknown

Seats beneath the new structure

Blue seating below the new upper structure, with work continuing at the far end.

Supplied by the site owner · Used with permission.

Date unknown

Aerial view of the works

An aerial view of cranes and the new upper tier on the Main Stand. The text overlay is part of the supplied image.

Supplied by the site owner · Used with permission.

Date unknown

The Main Stand today, from above

A modern aerial view of the completed Main Stand with its upper tier and roof, for comparison with the construction photographs.

Supplied by the site owner · Used with permission.

Date unknown

Lower seating during the works

Another view of the Main Stand seating beneath the new structure, with work continuing at the far end.

Supplied by the site owner · Used with permission.